China High quality PE Barrel Chemical Dosing System Quotes, Factory, Purchasing, Manufacturers page m
Home > Products > Chemical Dosing System > PE Barrel Chemical Dosing System

PE Barrel Chemical Dosing System

Brand : GONGYUAN

Product origin : CHINA

Delivery time : 30 DAYS

Supply capacity : 500 SETS/YEAR

PE Barrel Chemical Dosing System

Overview

Integrated chemical dosing system is mainly consist of doing pump, which put chemical dissolving tank, agitation, dosing unit, level switch,safe valve, check valve,pressure gauge, filter, buffer,pipe, valve, base, ladder,automatic monitoring system, electric control system on the public platform. This will form a module, namely skid-mounted system.

The chemical dosage and pressure can be adjusted based on the industrial process requirements by selecting correct dosing pump. The flow rate can be choosed from 1L/h to 8000L/h. And the pressure can be choosed from 0.1MPa to 25MPa. Based on the different transmission medium, there are many kinds of material to choose. <carbon steel, stainless steel, nonmetal material (including PP, PE, PVC, PFTE)>.


Features

1.high-speed ratio and high efficiency

2.compact structure and small volume

3.stable operation and low noise

4. Long service life

5. Easy to maintenance


Working principle

According to the chemical concentration, the dosing unit will prepare the chemical liquid in the agitating tank. After the agitation, the liquid will be put into the dissolving tank.  By using metering pump(dosing pump), the solution can be carried into dosing point or required system. 


Main Technical Parameter

No.

Type

Dimension

1

MC100

Φ450×700mm

2

MC200

Φ550×900mm

3

MC500

Φ810×1100mm

4

MC1000

Φ1040×1250mm


Product Photo

PE barrel.jpg


FAQ

(1)  Q: How to select the suitable product?

      A: You can provide us your water source, water quality, flow rate and ground area. (Give us more details about the sewage and surroundings.)

(2)  Q: How about the payment?

      A: We can accept TT, L/C,West union. TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

(3)  Q:How about the delivery time?

      A: It depends on the order quantities and DAF size. Generally, the delivery time will be around 30 days.

(4)  Q: How about the product package?

      A: Normally, we will adopt standard package. If the clients have the special requirements for package, we will charge the extra packaging fees.

(5)  Q: How to install the DAF unit after the unit arriving the destination?

      A: We will provide the detailed operation manual to you. If it is necessary, we will send technicians to help you. But the visa fee, air tickets, accommodation, wages will be paid by you.

Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
* Subject :
* Email :
  • Name :

  • Phone:

  • *Message :
    Message